We have lived in our house for almost five years now, and if I am being honest, the renovation momentum has been a little low lately.
After finishing the major renovation on my studio and staring at a punch list that never seems to get done inside the main house, I started to feel a little disenchanted with my own space. I love what we have accomplished so far, but after spending all day designing and solving renovation problems for clients, the last thing I want to do in the evening is start making design decisions for myself.
Sometimes I just want to sit on the sofa.
That is the funny thing about renovation momentum. Even designers can lose it.
Decision Fatigue Shows Up in More Places Than You Think
Decision fatigue can creep into a project at several different points.
Sometimes it starts at the very beginning. Homeowners are eager to get going and tell themselves, “We will figure that out when we get there.”
That approach can be dangerous in a renovation.
Without a clear plan in place that outlines materials, layouts, and key selections before construction begins, it is surprisingly easy to paint yourself into a corner. Construction already comes with plenty of surprises. Old houses in particular seem to specialize in them.
When design decisions are still being made in the middle of construction, things slow down quickly. Contractors need answers, materials have lead times, and suddenly everyone is waiting.
No one wants that. Especially not when the kitchen is torn apart, and you are living in the house.
The Gap Between Renovation Phases
But there is another place where momentum disappears that people rarely talk about.
It is the space between renovation phases.
This one gets me every time.
Renovations are not just about design. They are about purchasing, scheduling, budgeting, coordinating trades, answering contractor questions, navigating surprises, and living through the disruption of it all.
And living through it can feel like a gauntlet.
There is the dumpster in the driveway.
The port-a-potty in the yard.
Sawdust, then drywall dust, then more dust.
You are ordering takeout three nights a week. Everyone is sharing a bathroom. The driveway is blocked. Every morning, a crew shows up with questions.
Eventually, the delayed gratification starts to feel like a long endurance test.
And then, just to make things more complicated, you start feeling guilty about being frustrated. After all, you are fortunate enough to have a home worth improving in the first place.
So now you are tired and feeling bad about being tired.
Renovations are glamorous like that.
When the Shine Wears Off
If you are renovating in phases, the break between projects can feel like an oasis.
But eventually the shine from the last phase fades and you start noticing everything that still needs attention. The tricky part is that now you know exactly what starting the next phase will involve.
The dust.
The disruption.
The decisions.
And somehow that makes it harder to begin again.
That is where we have been for the past year. Our studio renovation changed our daily routine in ways we did not expect. For the first time in eight years, I can truly shut off work at the end of the day, because the studio is separate from the house.
But it also means that on nights when I need to answer a few emails or when the weather is particularly miserable, I have to walk outside to the studio just to take care of a few small things.
And there is absolutely no room in the house for another desk. None.
Phase three of our renovation plan, although at this rate it might be phase eleven, is a fairly major addition to the house. The plan includes a new kitchen, a primary suite, and a small study or reading room where I can at least keep a laptop and handle the occasional evening task without trekking across the yard in the rain.
That study has become increasingly appealing on the nights when I just need an hour to wrap up a few things. But realistically, we are probably a year away from breaking ground on what will hopefully be the final phase of turning this into the house I have always imagined.
Which means that for now, the momentum still has to come from smaller steps.
The Small Decision That Restarted Everything
Here is what has happened over the past couple of weeks, though.
Momentum has started creeping back.
I had been eyeing a cabinet for our entryway for months. After fall market, it went on sale, and since I was already placing an order for a client from the same manufacturer, I finally decided to go for it.
The hallway is not finished. Not even close.
There is still no trim around the front door.
There is a large patch on the wall that has not been painted.
Some baseboards are missing entirely.
But I ordered the cabinet anyway.
We brought it home Tuesday. I unpacked it Wednesday. We installed it Friday.
And I absolutely love it.
Suddenly, I was ordering baskets for the little shelves so we could store hats and sunglasses. That led to wall hooks for the opposite side of the entry, because at the moment, we are literally using screws sticking out of the wall.
Later that night, I found myself in the basement sorting through fabric remnants to finally sew the small curtains I had been meaning to make for our furniture-style island.
The next morning, we cleaned the porch. Then I ordered new cushions for the outdoor sofa. Then, outdoor rugs.
By the afternoon, I was sewing drapes and the Amazon delivery had arrived with the baskets for the cabinet so we could finally clear off the entry surfaces.
In less than twenty four hours, I had done more for my house and my own sense of home than I had in the previous four months.
That is momentum.
Where a Designer Can Make the Difference
One of the biggest reasons people hire a designer is not just for aesthetics. It is for momentum.
A thoughtful design process guides the hundreds of decisions that go into a renovation so they happen in the right order and at the right time. Materials are selected before construction begins. Specifications are clear. Contractors have the information they need before questions turn into delays.
That kind of preparation can prevent days or even weeks of unnecessary slowdown during construction.
A designer also helps set expectations for what living through a renovation is really like. There will be dust. There will be noise. There will be a dumpster in the driveway for longer than anyone planned.
But there will also be a moment at the end when the house finally settles back down and everything starts to feel like home again.
Sometimes our role is simply to sit with a client for a moment in the middle of the chaos and remind them how incredible the finished space is going to be.
I can personally relate to the temporary dumpster fire that life can become when you are living through a renovation.
I have been there too.
Moving Forward Again
The point of all of this is not that every project requires a designer, or that momentum never slows down.
Renovations are demanding. They disrupt routines, require hundreds of decisions, and ask you to imagine a finished space while living in the mess of the middle.
If you find yourself stalled, sometimes the solution is not solving everything at once. Sometimes it is making one good decision that nudges the project forward again.
And if the decisions start to feel overwhelming, getting a little help can make all the difference.
Because once momentum returns, the house starts to feel hopeful again.